This procedure is intended to provide guidance and establish controls to ensure total traceability of oxygen piping components back to the Manufacturer’s Mill Certificate / Certificate of Conformity, thus ensuring correct materials are installed.
A. Storage & Handling :
• Piping components for oxygen piping systems shall be stored, protected and issued in accordance with OWNER Specification.
B. Fabrication & Installation:
B. Fabrication & Installation:
• Upon receipt, piping components shall be checked for identification in accordance with Owner's Specification.
• For piping components which require total traceability the OWNER unique number must be die stamped or vibro etched on each component.
• Prior to issue of any piping components, the Stores Controller and Piping Supervisor / Foreman must confirm that each component is clearly identified with the OWNER unique number which enables traceability back to manufacturer’s mill certificate/certificate of conformity.
• Immediately upon issue of piping components the Piping Supervisor shall record all unique numbers against the relevant items on the approved isometric drawings.
• Transfer of identification markings prior to cutting shall be in accordance with Owner's Specification.
C. Fabrication & Installation:
• At the weld fit-up stage and prior to welding, the Q.C. Inspector shall confirm that each component of the weld joint is clearly identified with a OWNER unique number. This number shall be recorded on the weld fit-up / visual inspection report. The unique number shall be confirmed by both OWNER Q.C. representatives who shall endorse the inspection report.
• Upon visual acceptance of a particular weld, the details of the piping components unique numbers shall be entered into the News Data Base.
• The News Data Base, which has already been loaded with all relevant data regarding item code numbers/unique numbers automatically checks the data entered against material traceability standard tables. Any non-compliance shall then be identified.
Would you like to take the full version, including its native file (word & pdf file), of the Method Statement for Total Traceability of Oxygen Piping Materials Template? Simply click the "DOWNLOAD NOW" below;
0 comments Blogger 0 Facebook
Post a Comment